Remodeling Marketing · Winnipeg, MB

Remodeling Marketing in Winnipeg

Most of Winnipeg's housing was built before 1981, and much of it is ready for new kitchens, bathrooms, basements and energy upgrades. We help renovation and remodelling companies across the metro show their best work, rank for the projects they want, run campaigns aimed at the right neighbourhoods, and follow up on every consultation until the contract is signed.

Winnipeg context

Renovation demand in Winnipeg homes

Housing from the 1960s and 1970s

The largest construction-period group of homes in the Winnipeg metro, 99,170 occupied dwellings, went up between 1961 and 1980, and another 96,825 predate 1961 (2021 Census). Owners occupy 216,880 of the metro's households. Original kitchens, cramped bathrooms and unfinished basements in houses of that era are typical starting points for remodelling projects.

Permits, and what skips them

The City of Winnipeg requires permits for basement development, home renovations, additions and plumbing installations, but not for interior finishing such as painting or installing cabinets, or for swapping doors and windows of the same size. Remodellers who explain which parts of a project need a permit, and then handle it, take a worry off the homeowner's list.

Energy upgrades with rebates

Efficiency Manitoba pays rebates on cold-climate heat pumps installed in existing homes by contractors registered with it; new homes are excluded. With 21,135 metro dwellings needing major repairs in 2021, a renovation that bundles comfort and efficiency upgrades gives homeowners a stronger reason to start now rather than next year.

Why Winnipeg remodellers lose good projects

01

Galleries without context

Photos alone rarely sell a renovation. Before-and-after stories with scope, timeline and neighbourhood help a homeowner picture their own project.

02

Slow consultation follow-up

A homeowner meeting three remodellers often signs with the one who sends a clear proposal first. Automated reminders keep yours from slipping.

03

Seasonal swings in inquiries

Interior projects can run through the winter while exterior work waits for the thaw. Campaigns should shift between them rather than run flat all year.

Areas we serve

We market renovation companies to homeowners in established neighbourhoods like these, as well as newer areas and nearby towns:

  • St. Vital
  • St. Boniface
  • Charleswood
  • Transcona
  • Headingley
  • Osborne Village
  • The Exchange District
  • Bridgwater

Questions and answers

Yes. The City of Winnipeg lists basement and lower-level development among projects that need a permit, along with home renovations and plumbing installations. Purely cosmetic interior work such as painting or installing cabinets does not. Remodellers who handle permits for clients should say so clearly on their sites.

Start with the projects you do most profitably, then match them to the housing stock. With nearly six in ten metro homes built in 1980 or earlier, kitchens, bathrooms, basements and energy upgrades are natural fits. We test each with its own landing page and keep spending where consultations turn into contracts.

They can. Efficiency Manitoba's air source heat pump rebate applies to existing homes when the contractor is registered with Efficiency Manitoba, among other conditions. If your firm is registered, we feature that on project pages and ads so homeowners see the added value early.

Tell us about your project.